BACKGROUND The RPS is a unique technology for missions that require a long- term, unattended source of heat and/or electrical power for use in harsh and remote environments--such as deep-space. The Pu-238 in these units serves as the source for generating heat and electricity. The heat source can be used directly to warm critical spacecraft components. Currently, DOE plans to produce RPS in support of Government national security and space exploration missions at three geographically separate and distant DOE sites: the Oak Ridge National Laboratory (ORNL), Tennessee; Los Alamos National Laboratory (LANL), New Mexico; and the Idaho Site, Idaho. DOE proposes to consolidate all nuclear activities of the existing and future RPS production operations at a single, highly secure DOE site. This consolidation would be consistent with DOE's approach on consolidating nuclear materials, increasing the security of nuclear materials, and reducing risks associated with the transportation of nuclear materials. The nuclear infrastructure required to produce RPS is comprised of three major components: (1) The production of Pu-238; (2) the purification and encapsulation of Pu-238 into a fuel form; and (3) the assembly, testing, and delivery of the RPS to the Federal users. The three major components of the existing infrastructure, including their current status, are briefly described below: Production of Pu-238: The Pu-238 production process consists of the fabrication of neptunium-237 (Np-237) targets, irradiation of the targets in a suitable irradiation facility, and the recovery of Pu-238 from the irradiated targets through chemical processing. In the past, Pu-238 was produced at DOE's Savannah River Site (SRS), using reactors that are no longer operating. After SRS stopped producing Pu-238, DOE satisfied its Pu-238 requirement by using DOE's available inventory in storage at LANL. This inventory was augmented by Pu-238 purchased from Russia for use in space missions. DOE analyzed the need for reestablishment of Pu-238 production capability in the Programmatic Environmental Impact Statement for Accomplishing Expanded Civilian Nuclear Energy> Research and Development and Isotope Production Missions in the United States, Including the Role of the Fast Flux Test Facility (NI PEIS) (DOE/EIS-0310), issued in December 2000. On the basis of the analysis in the NI PEIS, DOE issued a Record of Decision (ROD) (66 FR 7877, January 26, 2001) to reestablish Pu-238 production capability at ORNL using the Radiochemical Engineering Development Center (REDC) for the fabrication of targets and extraction of Pu-238 from the irradiated targets. The Advanced Test Reactor (ATR) located at the Idaho National Engineering and Environmental Laboratory (also referred to as the Idaho Site), supplemented by the High Flux Isotope Reactor (HFIR) located at ORNL, would be used in the irradiation of targets, and the irradiated targets would be returned to REDC/ORNL for extraction of Pu-238. This decision, however, has not yet been implemented and the DOE has expended no resources to establish the Pu-238 production at the Oak Ridge Site. Np-237, the feed material for fabrication of targets for Pu-238 production, had been stored at the SRS where Pu-238 was historically produced. In the NI PEIS ROD, DOE decided to transfer this material to ORNL since the Pu-238 capability was planned to be reestablished there. However, Np-237 is a special nuclear material and, after the events of September 11, 2001, it required a higher level of security than could be reasonably provided at REDC/ORNL. Therefore, DOE amended the ROD for the NI PEIS to change the storage location for Np-237 from ORNL to the Idaho Site (69 FR 50180, August 13, 2004). Np-237, in the form of an oxide, will be shipped from SRS to the Idaho Site beginning in FY 2005 (and ending in FY 2006) for storage until needed for Pu-238 production. Purification and Encapsulation of Pu-238: Pu-238 is purified and encapsulated in a metal capsule and welded closed. These fuel capsules are used as a heat source in the RPS. The purification and encapsulation work is currently conducted within the Technical Area-55 (TA-55) complex at LANL. The finished Pu-238 fuel capsules are shipped from LANL for assembly of the RPS at the Idaho Site. Assembly and Test Operations: From the early 1980s until late-2002, DOE conducted its assembly and test operations for the RPS at the Mound Site in Miamisburg, Ohio. Increased security requirements and concerns resulting from the attacks on September 11, 2001, led DOE to transfer these operations to the Idaho Site to provide enhanced security in a cost effective manner at a highly secure DOE site. The environmental impacts of the transfer from the Mound Site to the Idaho Site were assessed in an Environmental Assessment (DOE/EA-1343). A Finding of No Significant Impact was signed by DOE on August 30, 2002, and the transfer of the assembly and testing capability was initiated. The first RPS will be assembled and tested at the Idaho Site by September 2005 in support of the National Aeronautics and Space Administration's (NASA) planned mission to survey the planet Pluto. In summary, the current RPS production capability and infrastructure resides at or was planned to reside within the DOE complex at the following different locations:
Purpose and Need for Agency Action As described above, RPS production infrastructure exists at or is planned for DOE sites in three locations: ORNL, LANL, and the Idaho Site. Consolidation of these operations at a single site would significantly increase security of the nuclear material while reducing risks associated with the transport of radioactive material. Proposed Action DOE proposes to consolidate all Pu-238 operations at a single, highly secure site within its complex. These operations include the production of Pu-238, purification and encapsulation of Pu-238, and the assembly and testing of the RPS. Preliminary Alternatives Consistent with NEPA implementation requirements, the EIS will assess the range of reasonable alternatives regarding DOE's need to consolidate nuclear operations related to RPS. DOE has identified the following two alternatives for the proposed RPS Production Consolidation Project.
Preliminary Identification of Environmental Issues The issues listed below have been tentatively identified for analysis in the EIS. This list is presented to facilitate public comment on the scope of the EIS. It is not intended to be all-inclusive or to predetermine the potential impacts of any of the alternatives. DOE seeks public comments on the adequacy and completeness of the following issues:
Related NEPA Documentation NEPA documents that have been prepared for activities related to the proposed action include, but are not limited to, the following:
Public Reading Rooms Documents referenced in this NOI and other related information are available at DOE-Idaho Operations Office Public Reading Room, 1776 Science Center Drive, Idaho Falls, ID 83415 (telephone 208-526-0271) and U.S. Department of Energy, Freedom of Information Reading Room, Forrestal Building, Room 1E-190,1000 Independence Avenue, SW., Washington, DC 20585-0117 (telephone 202-586-3142). As mentioned above, DOE's NEPA documents, including this NOI, are available at the DOE NEPA Web site (http://www.eh.doe.gov/nepa) and the RPS EIS Web site ConsolidationEIS.doe.gov. Public Involvement Opportunities DOE seeks public involvement in the preparation of the EIS and solicits public comments on its scope and content as well as participation at the public scoping meetings in Idaho, Wyoming, New Mexico, Tennessee, and Washington, DC. DOE personnel will be available at the scoping meetings to explain the proposed project and answer questions. DOE will designate a neutral facilitator for the scoping meetings. During the first hour of each meeting, attendees may register, view displays, and discuss issues and concerns informally with DOE representatives. Following registration and the informal session, there will be a formal presentation and a period for questions, answers, and comments. To ensure that all persons wishing to express their comments are given an opportunity, a five-minute limit may be applied for each person; however, public officials and representatives of groups would be allotted ten minutes each. DOE encourages those presenting comments orally to also submit written comments, if possible. Comment cards will be available at the meetings for those who prefer to submit their comments in writing. Participants may be asked clarifying questions to ensure that DOE representatives fully understand the comments and suggestions. NEPA Process The EIS for the proposed consolidation of nuclear operations related to the production of RPS will be prepared pursuant to the NEPA of 1969, the Council on Environmental Quality's Regulations for Implementing the Procedural Provisions of NEPA (40 CFR Parts 1500- 1508), and DOE NEPA Implementing Procedures (10 CFR Part 1021). A 45- day comment period on the draft EIS is planned, during which public hearings will be held to receive comments. The draft EIS is scheduled to be issued in late spring 2005. Availability of the draft EIS, the dates of the public comment period, and information about the public hearings will be announced in the Federal Register and in local news media when the draft EIS is distributed. The final EIS is scheduled to be issued in late 2005. No sooner than 30 days after the U.S. Environmental Protection Agency's notice of availability of the final EIS is published in the Federal Register, DOE may issue its ROD. Page Updated: 11/4/06 |